Project Background

 

At the beginning of 2016, a medium-sized logistics company operating inland port services reached out to us. The front area of their port berth was extremely limited, and the existing mobile port cranes could no longer meet the growing demand for bulk cargo handling. Moreover, due to the narrow working space at the dock, even considering larger mobile port cranes was not feasible because of insufficient safety clearance.


After a thorough on-site survey and operational assessment, we ultimately recommended a fixed port crane solution to the client-specifically, a heavy-duty revolving crane installed on a permanent base. This design fundamentally reduced the footprint of the equipment at the dock front, freeing up valuable quay space for temporary cargo storage and in-yard vehicle circulation.

 

Delivered Technical Solution

 

The fixed port crane supplied in this project is equipped with dual lifting points consisting of a main hook and an auxiliary hook, capable of full-slewing operation. Fully optimized during the design phase to handle diverse cargo types, the equipment supports loading and unloading of bulk cargo via grab buckets, general breakbulk cargo, as well as extra-long and super-heavy project cargo using specialized spreaders.

 

Key performance parameters are listed below:

  • Rated lifting capacity of main hook: 60 tons at a working radius of 6–10 m; 30 tons at a working radius of 25 m (engineered for heavy-lift operations)
  • Rated lifting capacity of auxiliary hook: 10 tons (for light cargo handling and fine positioning adjustment)
  • Working radius range: 6.6 m to 35 m
  • Luffing mechanism: Approximately 5 minutes for full luffing travel from minimum to maximum working radius
  • Slewing mechanism: Full-circle slewing with variable frequency drive for precise positioning
  • Boom system: Optimized truss-type boom that balances maximum operating outreach and overall machine stability under full-load conditions

 

With fixed installation adopted, the mobile undercarriage and associated travelling mechanisms are eliminated from the port crane. This not only cuts down the initial procurement cost, but also significantly reduces long-term maintenance expenses for the travelling system. Such merits are particularly valuable given the client's constrained budget and harsh on-site environmental conditions.

Fixed Port Crane

Fixed Port Crane

Operating Environment & Challenge Countermeasures

 

The port is located in a tropical climatic zone, with ambient temperatures fluctuating between -10°C and +45°C and a maximum relative air humidity of up to 90%. Wind conditions constitute another critical limiting factor: the allowable wind speed for normal operations is 20 m/s; the unit must withstand an extreme wind speed of 55 m/s under working conditions, and resist strong winds of 40 m/s when parked and anchored in non-operational status.

 

To accommodate the above harsh operating conditions, this fixed port crane is specially equipped with the following configurations:

  • Heavy-duty slewing bearings from world-renowned brands
  • Marine anti-corrosion coating treatment with epoxy paint finish
  • High-capacity wind-resistant brakes and anchoring devices
  • Electrical cabinets with high protection ratings (IP44 for indoor sections, IP66 for outdoor sections) to effectively block dust and moisture ingress
  • Torque display and monitoring system integrated with sensors for weight, height, wind speed, and other parameters
  • Integrated PLC information processing system

Fixed Port Crane

Fixed Port Crane

Implementation Process & Operational Performance

 

The entire installation cycle, covering foundation construction, general equipment assembly, and load testing, was strictly controlled within six months. Designed in compliance with the lifting standard Hsig-1m, the fixed port crane can guarantee safe hoisting operations even amid minor vessel movements induced by swells and currents.

 

Key Operational Data

 

  • Improved Throughput Capacity

Compared with the mobile portal cranes, the bulk cargo handling efficiency has risen by 40%. Thanks to shorter operating cycle times under grab working conditions for this fixed port crane, the average port berthing time per vessel has been cut by 2.5 hours.

 

  • Higher Yard Utilization Rate

By eliminating turning lanes and operating clearances required for mobile cranes, approximately 200 square meters of usable space has been freed up on the terminal operating area, which is now utilized for temporary container stacking and transshipment of pre-lashed cargo.

 

  • Operational Reliability

Over the 12 months since commissioning, the overall equipment availability of the complete machine has reached 98.7%, with zero unplanned shutdowns caused by structural or mechanical failures.

 

  • Optimized Safety Indicators

The fixed structure fundamentally eliminates the risk of overturning and enhances load stability under strong wind conditions. No safety incidents were recorded throughout the first year of operation.

 

Customer Feedback

 

The port operations manager commented: "This fixed port crane has revolutionized our entire operation. We had reservations about phasing out mobile equipment at first, yet its actual performance has far exceeded our expectations in terms of stability, reduced maintenance costs, and streamlined staffing requirements. Operators are highly satisfied with the responsive slewing controls, while the maintenance team appreciates the easy access for servicing all core components."

 

Conclusions & Equipment Selection Recommendations

 

This case fully validates that fixed port cranes represent a highly cost-Fixed Port Craneeffective and efficient solution for ports constrained by limited berth space, harsh operating environments, or tight capital budgets. Boasting a robust structural design, straightforward after-sales maintenance, and superior operational efficiency, they are ideal for medium-sized inland and coastal ports looking to substantially boost cargo handling capacity without extensive infrastructure expansion.

 

For port operators evaluating fixed port cranes, we recommend prioritizing the following key factors during assessment:

  • Usable working space at the berth and foundation bearing capacity
  • Composition of actual cargo types (bulk cargo, general cargo or container-dominated handling)
  • Local wind load parameters and seismic fortification standards
  • Required maximum outreach and lifting height
  • On-site power supply capacity and layout planning for routine maintenance access

 

Based on our project experience, as long as the early planning and custom design are done right, a well-matched fixed port crane can fully meet the toughest operational requirements while giving clients great return on investment.

 