The fasteners (bolts, nuts, pins, etc.) of marine cranes and other equipment are affected by vibration, impact, and corrosion for a long time and are prone to loosening and failure. Here are the key takeaways for efficient inspection and maintenance:
List of key inspection parts
- Load-bearing structure connection: Offshore crane's base and deck fixing bolts, boom truss node bolts;
- Connecting moving parts: luffing cylinder pins, slewing rings connecting bolts;
- Key mechanism installation: hoisting winch base bolts, brake fixing nuts;
- Exposure to the marine environment: fasteners in the open air (susceptible to salt spray corrosion).
Four-step inspection method: quickly locate hidden dangers
1. Visual judgment
- Observe whether the anti-loosening mark (paint line/color code) is misaligned;
- Check whether the exposed length of the thread is abnormal (the nut may be withdrawn when loose);
- Inspect the surface of fasteners for rust, cracks, or deformation.
2. Knock detection: Tap the nut with a copper hammer:
- Make a crisp sound: the connection is regular;
- Muffled or shaky sound: may be loose and needs to be further detected with a torque wrench.
3. Torque retightening Torque values according to manufacturer's standard:
- Re-tighten the suspected loose parts (such as the bolts of the slewing platform) one by one and record the torque value;
- More 20% of the fasteners must be replaced (the threads may be worn).
4. Non-destructive testing For key parts (such as boom main stress bolts):
- Use ultrasonic or magnetic particle flaw detection every year to check for internal cracks;
- Replace the crack at the bottom of the thread immediately, and it is strictly forbidden to continue to use it.
Anti-loosening and anti-corrosion measures
1. Mechanical anti-loosening
- Install spring washers and stop gaskets;
- Important parts are loosened in series with cotter pins (such as hook pins) or steel wires.
2. Glue bonding and anti-loosening
- Apply thread locker (medium strength for ordinary bolts, high strength for critical parts);
- After sizing, reload according to the specified curing time (usually 24 hours).
3. Antiseptic treatment
- Galvanized or Dacromet coated bolts: salt spray resistance life of more than 5 years;
- Open-air fasteners are regularly coated with anti-corrosion grease to isolate seawater erosion.
Maintenance cycle and records
- Daily inspection: check the fasteners of moving parts before each marine crane's shift;
- Regular comprehensive inspection: re-tighten the fasteners of the whole deck crane once a quarter;
- Establish a ledger: record each bolt's torque value, replacement time, and flaw detection results for easy traceability.
Risk Warning
- When the connecting bolts of the boom are found to be loose, stop the offshore crane's operation immediately and set up a warning area.
- It is forbidden to use worn wrenches (easy to slip and cause an overload of bolts).
- After severe weather, such as typhoons, all exposed fasteners must be inspected urgently.
Standardized fastener inspections can reduce the risk of ship crane structures falling by up to 80% and are the "basic line of defense" for safety in offshore operations.