Narrow fishing harbors are generally characterized by short shorelines, dense vessels, and numerous obstacles. Coupled with significant impacts from tides and swells, they impose extremely high requirements on the operational accuracy and spatial control of marine telescopic folding jib deck cranes. Drawing on frontline experience, this paper summarizes practical skills from three dimensions-pre-operation preparation, core operation, and risk avoidance- to improve operational efficiency and safety.
I. Pre-operation: Accurate Survey + Equipment Commissioning to Lay a Solid Safety Foundation
The primary risk of operations in narrow fishing harbors is collisions resulting from insufficient space. Pre-operation preparation should focus on spatial prediction and equipment adaptation to avoid blind construction.
1. On-site survey and drawing of a simple operation diagram
Operators shall arrive at the site 15–20 minutes in advance and complete the on-site survey through visual inspection and distance measuring tools, focusing on the following three tasks:
Horizontal space measurement: Use the telescopic folding jib crane's built-in or laser rangefinder to measure the distance to obstacles within the slewing radius, mark mooring bollards, adjacent ships, and other challenging barriers. The minimum safe distance is recommended to be at least 1.5 meters (or at least 2 meters in rough swells).
Vertical height confirmation: Check for low-altitude obstacles such as power lines and communication optical cables above the harbor, and record the maximum safe lifting height of the jib to prevent collision during jib elevation.
Ship attitude prediction: Judge the rolling amplitude of fishing boats based on tide and swell direction. If the amplitude is ≥30 cm, communicate in advance to secure the ship or wait for calmer swells before the operation.
After the survey, draw a simple operation diagram, marking the deck crane position, obstacle distribution, and safe range to ensure information synchronization among commanders, hookers, and other personnel.
2. Targeted equipment commissioning to adapt to narrow space requirements
Conduct three special commissioning tasks on the marine crane according to the characteristics of narrow spaces to reduce operational difficulty:
Speed mode switching: Switch from "high-efficiency mode" to "precision mode", lessen the jib telescoping and slewing speed to 50%–70% of the normal level to improve controllability.
Limit function calibration: Use the telescopic kuckle boom crane's "electronic limit" function to preset the left and right limit angles of jib slewing and the upper limit of lifting height, avoiding collisions caused by operational errors. If the deck crane is not equipped with an electronic limit, make physical marks (e.g., painted lines) on the foldable crane's slewing base as operational references.
Viewing aid inspection: Clean salt spray stains on the cab glass to ensure clear visibility. Temporarily install high-definition cameras to compensate for blind spots when the space is too narrow.
II. During Operation: Operating Skills + Team Coordination to Improve Efficiency and Precision
Operations in narrow fishing harbors shall follow the principle of "slow operation, stable lifting and smart avoidance", requiring flexible application of operating skills and strengthened team collaboration.
1. Marine crane's jib operation shall follow the principle of small-amplitude slewing + segmented telescoping
The jib is the core executive component. During operation, it is necessary to accurately control the coordination rhythm of slewing, telescoping, and luffing:
Slewing operation: Combine "inching + observation". Avoid continuous large-amplitude slewing; adopt the inching control lever method. Pause for 1–2 seconds after each 10°–15° slewing, and continue only after confirming safety through observation. When approaching obstacles, the commander shall prompt the distance in real time.
Telescoping and luffing: "Luff first, then telescope" for better stability.
Operation in narrow channels: When operating between two ships (width ≤5 meters), swing the jib to the safe area on one side of the channel first. After hooking, slowly rotate it to the top of the channel to lift, avoiding large-scale adjustments of the jib within the channel.
2. Lifting shall follow the principle of low-center-of-gravity hoisting + short-distance translation
Heavy objects swaying in narrow spaces are prone to collision. The lifting and translation process must firmly grasp the core of "center-of-gravity stability":
Lifting phase: After hooking, lift the heavy object 10–20 cm first, pause for 3–5 seconds to check stability and hook firmness. If swaying occurs, make fine adjustments to stabilize it before further lifting. The height shall be just enough to cross obstacles to avoid increased swaying risk due to excessive height.
Translation phase: "Short-distance translation multiple times". If it is necessary to translate the heavy object from the fishing boat to the dock over a long distance (>10 meters), complete the translation in 2–3 times. Pause after each translation and continue only after the heavy object has stabilized. During translation, keep the jib's elevation angle unchanged to avoid the center-of-gravity offset of the heavy object caused by luffing.
Lowering phase: After aligning with the placement point, lower at a speed ≤0.5 m/s. Switch to micro-speed mode when 1 meter away to ensure a smooth landing.
3. Ensure efficient team coordination in narrow spaces
Operators' vision is easily blocked in narrow spaces, so close coordination with commanders and hookers is essential:
Unified command gestures: Agree on special gestures in advance, such as "small-amplitude left turn" and "slow telescoping", supplemented by verbal prompts. Commanders shall stand at a position with clear vision and use large gesture amplitudes.
Real-time feedback from hookers: Hookers shall monitor the distance between the heavy object and the fishing boat deck or shipboard. Immediately send a "pause" signal if collision risk is detected. After hooking up, evacuate to a safe area and then signal the commander that lifting can proceed.
Coordination in emergencies: Immediately suspend operation when encountering strong swells and lift the heavy object to a safe height. Stop the machine for inspection if equipment abnormalities are found, and never operate with faults.
III. Post-operation: Inspection and Experience Summary
After the fodable knuckle boom crane operation, conduct targeted equipment maintenance and experience summary based on the characteristics of the marine environment and operational wear, to accumulate experience for future operations:
Special equipment inspection: Focus on inspecting the slewing, telescoping mechanism, and hydraulic system. Clean salt deposits on the slewing base with fresh water and wipe dry. Could you check the hydraulic oil condition and limit devices to ensure regular operation for the next task?
Operational experience review: Communicate with team members about problems encountered during operation, record them in the operation log, and formulate improvement measures for the identified issues.
Environmental data recording: Record data such as tides, swells, and obstacle changes to establish an exclusive database, which can be directly referenced in subsequent operations to improve efficiency.